Consultancy

Mix Design of Concrete

Coordinator : Dr. S. Rahima Shabeen

Project Cost : ₹ .413 Lakhs

Duration : 22-APR-25 to 21-MAY-25

Funding  : KSR Associates

Techno-Socio Impact Study on CNG Pipe Crossings at Ponnai River and Palar River

Coordinator : Dr. E. Arun Babu

Project Cost : ₹ 9.86143 Lakhs

Duration : 20-FEB-25 to 20-MAY-25

Funding  : AGP City Gas Pvt Ltd Vellore

Shoreline Change Study at Kattupalli, Ponneri Taluk, Tamil Nadu

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 27 Lakhs

Duration : 09-JAN-25 to 27-DEC-21

Funding  : Adani Port

Mix Design of Concrete

Coordinator : Dr. S. Rahima Shabeen

Project Cost : ₹ .413 Lakhs

Duration : 30-DEC-24 to 30-JAN-25

Funding  : Blue Leaf Project Pvt Ltd

Mix Design of Concrete

Coordinator : Dr. S. Rahima Shabeen

Project Cost : ₹ .413 Lakhs

Duration : 10-OCT-24 to 11-NOV-24

Funding  : Vedass Global Infrastructure & Projects Pvt. Ltd

TANFED-500MTs Capacity Godown constructed in the year 1975- To issue stability certificate for the Foundation and building

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 68500 Lakhs

Duration : 18-JUN-24 to 24-JUN-24

Funding  : TAMILNADU COOPERATIVE MARKETING FEDERATION LIMITED

Mix Design of Concrete

Coordinator : Dr. S. Rahima Shabeen

Project Cost : ₹ .413 Lakhs

Duration : 14-JUN-24 to 15-JUL-24

Funding  : Sri Vari Constructions

Inspecting the building situated at old No.37, New No.06, Arcot Road, Vadapalani chennai-600026 and submission of report on stability of the building

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 157000 Lakhs

Duration : 09-JUN-24 to 21-JUN-24

Funding  : Deputy Revenue officer/Zonal officer

vetting of the structural design and detailing of the proposed upgradation of vyasarpadi kannigapuram playground construction, Chennai

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 83048 Lakhs

Duration : 16-MAY-24 to 20-MAY-24

Funding  : Chennai Metropolitan Development Authority chennai

Mix Design of Concrete

Coordinator : Dr. S. Rahima Shabeen

Project Cost : ₹ .413 Lakhs

Duration : 03-MAY-24 to 03-JUN-24

Funding  : GRM Construction

Removal of legacy waste dumped at resource recovery park in kaveripakkam town panchayat through biomining

Coordinator : B. Manimekalai

Project Cost : ₹ 236000 Lakhs

Duration : 27-APR-24 to 10-DEC-24

Funding  : Kaveripakkam

TANFED-500MTs Capacity Godown constructed in the year 1975-To issue stability certificate for Foundation and building

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 20000 Lakhs

Duration : 22-APR-24 to 10-MAY-24

Funding  : Tamilnadu Cooperative Marketing Federation Limited

vetting of the structural design and detailing of the upgradation of May day park at chintadripet, Chennai

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 28426 Lakhs

Duration : 06-APR-24 to 12-APR-24

Funding  : Chennai Metropolitan Development Authority, Chennai

vetting of the structural design and detailing of the redevelopment of Dobikhana at chetpet, chennai

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 363747 Lakhs

Duration : 06-APR-24 to 12-APR-24

Funding  : Chennai Metropolitan Development Authority, Chennai

Preliminary Visual Inspection of Building

Coordinator : Dr. S. Rahima Shabeen

Project Cost : ₹ .2 Lakhs

Duration : 15-MAR-24 to 15-APR-24

Funding  : Individual

Inspection on Construction of Medical College Building

Coordinator : Dr. S. Rahima Shabeen

Project Cost : ₹ 2.5 Lakhs

Duration : 12-MAR-24 to 12-APR-24

Funding  : PWD

vetting of the Structural design and detailing of the proposed construction of the community hall, new Street at Alandur, Chennai

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 126089 Lakhs

Duration : 11-MAR-24 to 18-MAR-24

Funding  : Chennai Metropoloitan Development authority , Chennai

M30 Mix Design for providing Comprehensive underground sewerage scheme to jalladampettai division 191, Zone XIV in the expand chennai city

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 41300 Lakhs

Duration : 11-MAR-24 to 08-APR-24

Funding  : NR and Co

Inspecting the building situated at old no.37, new no.06, Arcot road, Vadapalani, Chennai-600026 and submission of report on stability of the building

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 20000 Lakhs

Duration : 11-MAR-24 to 12-APR-24

Funding  : Deputy Revenue officer/Zonal officer

Design and Vetting for 25 MT incinerator of vellore corporation

Coordinator : B. Manimekalai

Project Cost : ₹ 295000 Lakhs

Duration : 11-MAR-24 to 10-DEC-24

Funding  : vellore corporation

Mix Design of Concrete

Coordinator : Dr. S. Rahima Shabeen

Project Cost : ₹ .944 Lakhs

Duration : 20-JAN-24 to 20-FEB-24

Funding  : N.S.Periasamy & Co.

Vetting of the structural Design and detailing of the proposed construction of New school Complex in Corporation Middle School at Mahalakshmi Nagar, Puzhal

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 127801 Lakhs

Duration : 02-DEC-23 to 15-DEC-23

Funding  : Chennai Metroplitan Development Authority

Vetting of the structural Design and detailing of the proposed construction of New Buildings inside the gvt high school campus at konambedu, Annanur

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 88914 Lakhs

Duration : 02-DEC-23 to 15-DEC-23

Funding  : Chennai metropolitan development Authority

Preparation of Detailed Project Report for Establishment of Integrated Toll Gate Monitoring Centre

Coordinator : Dr. P. Shoba

Project Cost : ₹ 8.26 Lakhs

Duration : 17-SEP-23 to 25-OCT-24

Funding  : Tamil Nadu Police Department

Mix Design of Concrete

Coordinator : Dr. S. Rahima Shabeen

Project Cost : ₹ .413 Lakhs

Duration : 17-AUG-23 to 18-SEP-23

Funding  : Shanmathi Constructions (P) Ltd

Removal of legacy waste dumped at sholavandan Town Panchayat on resource recovery park at Ward No.3,Andyamedu main Road through biominig

Coordinator : B. Manimekalai

Project Cost : ₹ 236000 Lakhs

Duration : 16-JUN-23 to 10-DEC-24

Funding  : Sholavandan Town Panchayat,Madurai,Tamilnadu

MIX DESIGN for M20, M25, M30

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 295000 Lakhs

Duration : 27-MAY-23 to 27-JUN-23

Funding  : P.S.T Engineering Construction

Chettinad Cement Corporation Pvt.Ltd- Study of impact on Marudhayar River due to the reduction of Safety distance for mining of Periyathirukkonam village, Ariyalur District, Tamilnadu

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 15 Lakhs

Duration : 25-MAY-23 to 01-MAY-21

Funding  : Chettinad Cement Corporation Pvt.Ltd

Removal of legacy waste dumped at resource recovery park in Neerathan Rangasamuthiram road,Ward No.17 at Vadipatti Town Panchayat through Biomining

Coordinator : B. Manimekalai

Project Cost : ₹ 236000 Lakhs

Duration : 03-MAY-23 to 10-DEC-24

Funding  : Vadipatti Town Panchayat

Removal of legacy waste dumped at ward No.11,Palamedu main road,Alaganallur Town Pachayat on resource recovery park through biomining

Coordinator : B. Manimekalai

Project Cost : ₹ 236000 Lakhs

Duration : 27-APR-23 to 10-DEC-24

Funding  : Alanganallur Town Panchayat,Madurai,Tamilnadu

Biomining of legay waste dumped at the samykulam old compost yard in chinnamanur Municipality-DPR Evaluation

Coordinator : B. Manimekalai

Project Cost : ₹ 177000 Lakhs

Duration : 14-FEB-23 to 26-DEC-23

Funding  : Chinnamanur Municipality

Biomining of legacy waste of Neikarapatti town panchayat

Coordinator : B. Manimekalai

Project Cost : ₹ 236000 Lakhs

Duration : 14-FEB-23 to 10-DEC-24

Funding  : Neikkarapatti Town Panchayat

Solid waste Management systems-Biomiining of legacy waste of keeranur town Panchayat

Coordinator : B. Manimekalai

Project Cost : ₹ 236000 Lakhs

Duration : 10-FEB-23 to 10-DEC-24

Funding  : Keeranur Town Panchayat,Dindugal,Tamilnadu

Removal of Legacy waste through Biomining process in Vedahndur Town Panchayat

Coordinator : B. Manimekalai

Project Cost : ₹ 236000 Lakhs

Duration : 02-FEB-23 to 02-FEB-24

Funding  : Vedachandhur Town panchayat, Government of Tamilnadu

Removal of legacy waste through biomining process in Nilakottai Town Panchayat

Coordinator : B. Manimekalai

Project Cost : ₹ 236000 Lakhs

Duration : 02-FEB-23 to 10-DEC-24

Funding  : Nilakottai Town Panchayat

Biomining of legacy waste of chinnamanur Municipality

Coordinator : B. Manimekalai

Project Cost : ₹ 413000 Lakhs

Duration : 05-JAN-23 to 10-DEC-24

Funding  : Chinnamanur Municipality,Theni,Tamilnadu

Tail End Regulation Consultancy- Preparation of concept note for the construction of Tail end negotiation to prevent the intrusion of sea water under Climate Fund" funded by Tail End Regulation Consultancy, Vellore

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 6 Lakhs

Duration : 04-JAN-23 to 25-SEP-25

Funding  : Tail End Regulation Consultancy

Biomining project for removing legacy waste at Kannamangalam Town Panchayat

Coordinator : B. Manimekalai

Project Cost : ₹ 236000 Lakhs

Duration : 30-DEC-22 to 10-DEC-24

Funding  : Kannamangalam Town Panchayat

Solid waste Management System-Bioming of legacy waste of Natham Town panchayat

Coordinator : B. Manimekalai

Project Cost : ₹ 236000 Lakhs

Duration : 26-AUG-22 to 10-DEC-24

Funding  : NATHAM Town Pachyat,Tamilnadu

Biomining of legacy waste of Aundipatty selection grade Town Panchayat

Coordinator : B. Manimekalai

Project Cost : ₹ 236000 Lakhs

Duration : 26-AUG-22 to 10-DEC-24

Funding  : Aundipatti Sl.Gr.Town Panchayat,Tamilnadu

Biomining of legacy waste of Palanichettipatti Town Panchayat

Coordinator : B. Manimekalai

Project Cost : ₹ 236000 Lakhs

Duration : 26-AUG-22 to 10-DEC-24

Funding  : Palanichetti patti Town Panchayat

Identification of Sand Accretion sites in Non-Sensitive site at Andaman & Nicobar islands

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 8.5 Lakhs

Duration : 08-APR-22 to 09-MAY-23

Funding  : XX

Cuddalore PWD Project – The Comprehensive flood protection plan to three reivers in Cuddalore District" funded by PWD Cuddalore Consultancy

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 9.44 Lakhs

Duration : 02-FEB-21 to 29-NOV-22

Funding  : PWD Cuddalore Consultancy

Design of pipe network& pumping station for the diversion of flood water from Tamirabarani river to Vaippar river

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 9.44 Lakhs

Duration : 01-FEB-21 to 30-NOV-22

Funding  : XX

Traffic Impact study of e-challan by traffic police in greater Chennai police

Coordinator : Dr. G. Umadevi

Duration : 21-DEC-20 to 26-FEB-21

Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 56294 m3) through biomining” in Dharm

Coordinator : Dr. G. Dhinagaran

Duration : 19-SEP-20 to 18-JUN-21

Solid Waste Management System – Biomining of Legacy waste of Madathukulam Town Panchayat – PMC

Coordinator : Dr. G. Dhinagaran

Duration : 22-AUG-20 to 21-FEB-21

"Solid Waste Management system - Biomining of Legacy waste dumped at Private Lan - NGT case No.21/2019"

Coordinator : Dr. G. Dhinagaran

Duration : 24-MAR-20 to 23-SEP-20

"Solid waste Management - Removal of the Legacy waste dumped (approximately 32454 m3) through biomining in Mettupalayam Municipality

Coordinator : Dr. G. Dhinagaran

Duration : 24-MAR-20 to 23-DEC-20

"Solid waste Management - Removal of the Legacy waste dumped (approximately 95700 m3) through biomining in Pollachi Municipality

Coordinator : Dr. G. Dhinagaran

Duration : 21-MAR-20 to 20-MAR-21

Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 30050 m3) through biomining” in Kaday

Coordinator : Dr. G. Dhinagaran

Duration : 17-MAR-20 to 16-SEP-20

Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 20500 m3) through biomining” in Ambas

Coordinator : Dr. G. Dhinagaran

Duration : 17-MAR-20 to 16-SEP-20

Aranthangi Municipality- Project Management Consultant-Biomining of legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 10-MAR-20 to 10-MAR-20

Design of Storm Water Drain for TPIPL Project

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 3 Lakhs

Duration : 04-MAR-20 to 30-NOV-21

Funding  : Lancewood Infra Private Limited

MIX DESIGN M30

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 41300 Lakhs

Duration : 20-JAN-20 to 14-FEB-20

Funding  : CMWSSB

Evaluation of the DPR of Removal of Legacy Waste dumped on the Compost Yard by Sathyamangalam Municipality

Coordinator : Dr. G. Dhinagaran

Duration : 20-JAN-20 to 20-FEB-20

TNWRD – DRIPII-SPMU-DRIP I spillover Activity to DRIP II –Preparation of Emergency Action Plan for Sothuparai&Servalar Dam by Anna University

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 72 Lakhs

Duration : 01-JAN-20 to 31-DEC-24

Funding  : TNWRD

’Monitoring and Evaluation of Tamilnadu Irrigated Agriculture Modernisation (TNIAM) Project

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 900 Lakhs

Duration : 01-JAN-20 to 31-DEC-25

Funding  : TNIAM

Pattukkottai Municipality- Project Management Consultant-Biomining of legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 13-DEC-19 to 13-DEC-19

Mix Design - M30

Coordinator : Dr. S. Greeshma

Project Cost : ₹ .41 Lakhs

Duration : 12-DEC-19 to 12-JAN-20

Funding  : CPWD

Thiruvarur Municipality- Project Management Consultant-Biomining of legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 28-NOV-19 to 28-NOV-19

“Solid Waste Management System – Biomining of Legacy waste of Sulur Town Panchayat – PMC”

Coordinator : Dr. G. Dhinagaran

Duration : 20-NOV-19 to 20-MAY-20

Solid Waste Management System – Biomining of Legacy waste of Karaimadai Town Panchayat – Removal of legacy waste dumped on own land through biomin

Coordinator : Dr. G. Dhinagaran

Duration : 20-NOV-19 to 20-MAY-20

Attur Municipality- Project Management Consultant-Biomining of legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 19-NOV-19 to 19-NOV-19

CES– Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 49823 m3) through biomining” i

Coordinator : Dr. G. Dhinagaran

Duration : 16-OCT-19 to 05-JUL-20

CES– Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 25000 m3) through biomining” i

Coordinator : Dr. G. Dhinagaran

Duration : 16-OCT-19 to 15-APR-20

Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 22018 m3) through biomining” in Kange

Coordinator : Dr. G. Dhinagaran

Duration : 25-SEP-19 to 24-MAR-20

Project Management Consultant - “Solid Waste Management - Removing of the Legacy waste dumped (approximately 33700 m3) Through bio mining in Udumalp

Coordinator : Dr. G. Dhinagaran

Duration : 25-SEP-19 to 24-MAR-20

Consultancy work on – “Solid Waste Management System – Biomining of Legacy waste of Anthiyur Town Panchayat – PMC”

Coordinator : Dr. G. Dhinagaran

Duration : 25-SEP-19 to 24-MAR-20

Consultancy work on – “Solid Waste Management System – Biomining of Legacy waste of Periyanaickenpalayam Town Panchayat – PMC”

Coordinator : Dr. G. Dhinagaran

Duration : 19-SEP-19 to 18-MAR-20

Solid Waste Management System – Biomining of Legacy waste of Anaimalai Town Panchayat – PMC

Coordinator : Dr. G. Dhinagaran

Duration : 13-SEP-19 to 12-OCT-19

CES– Consultancy work on – “Solid Waste Management System – Biomining of Legacy waste of Avinashi Selection Grade Town Panchayat – PMC”

Coordinator : Dr. G. Dhinagaran

Duration : 05-SEP-19 to 04-MAR-20

CES– Project Management Consultancy– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 90000 cu.m) through bio-miningï

Coordinator : Dr. G. Dhinagaran

Duration : 04-SEP-19 to 03-SEP-20

Consultancy work on – “Solid Waste Management System – Biomining of Legacy waste of Kunnathur Town Panchayat – PMC”

Coordinator : Dr. G. Dhinagaran

Duration : 04-SEP-19 to 03-MAR-20

Solid Waste Management System – Biomining of Legacy waste of Suleeswaranpatti Town Panchayat – PMC

Coordinator : Dr. G. Dhinagaran

Duration : 29-AUG-19 to 28-NOV-19

Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 1,41,731 m3) through biomining” in Ka

Coordinator : Dr. G. Dhinagaran

Duration : 22-AUG-19 to 21-FEB-21

Solid Waste Management System – Biomining of Legacy waste of Harur Selection Grade Town Panchayat

Coordinator : Dr. G. Dhinagaran

Duration : 13-AUG-19 to 12-SEP-19

Solid Waste Management System – Biomining of Legacy waste of Karaimadai Town Panchayat – Removal of legacy waste dumped on own land through biomin

Coordinator : Dr. G. Dhinagaran

Duration : 13-AUG-19 to 12-SEP-19

Adequacy Study on Odour Control Measures at M/s Kierratys Fuels

Coordinator : Dr. S. Karthikeyan

Duration : 13-AUG-19 to 13-AUG-19

Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 61577 m3) through biomining” in Krish

Coordinator : Dr. G. Dhinagaran

Duration : 08-AUG-19 to 07-MAY-20

Solid Waste Management System – Biomining of Legacy waste of Annur Town Panchayat – Removal of legacy waste dumped on own land through biomining i

Coordinator : Dr. G. Dhinagaran

Duration : 07-AUG-19 to 06-SEP-19

Solid Waste Management System – Biomining of Legacy waste of Pallapatti Selection Grade Town Panchayat – DPR Evaluation

Coordinator : Dr. G. Dhinagaran

Duration : 02-AUG-19 to 01-SEP-19

Omalur Town Panchayat- SWM-Biomining of Legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 26-JUL-19 to 26-JUL-19

Consultancy work on “Project Management Consultant for Bio-Mining Project for for removing legacy waste dumped on Private land” by Vellakovil Muni

Coordinator : Dr. G. Dhinagaran

Duration : 17-JUL-19 to 16-JUL-20

Consultancy work on – “Solid Waste Management System – Biomining of Legacy waste of Denkanikottai Selection Grade Town Panchayat – DPR Evaluat

Coordinator : Dr. G. Dhinagaran

Duration : 15-JUL-19 to 14-AUG-19

Consultancy work on – Revamping of Existing Dumped Legacy waste (approximately 32454 cum) in Municipal compost yard at Sirjaj nagar, Chickkadasamapa

Coordinator : Dr. G. Dhinagaran

Duration : 15-JUL-19 to 14-AUG-19

Rasipuram Municipality- Project Management Consultant-Biomining of legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 01-JUL-19 to 01-JUL-19

Consultancy work on – “Solid Waste Management System – Biomining of Legacy waste of Kaveripattinam Selection Grade Town Panchayat – DPR Evalua

Coordinator : Dr. G. Dhinagaran

Duration : 28-JUN-19 to 28-JUN-19

Pallipalayam Municipality-SWM-- Project Management Consultant-Biomining of legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 19-JUN-19 to 19-JUN-19

Solid Waste Management System – Biomining of Legacy waste of Dharapuram Municipality – DPR Evaluation

Coordinator : Dr. G. Dhinagaran

Duration : 18-JUN-19 to 18-JUL-19

Jalakandapuram Town Panchayat- SWM-Biomining of Legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 17-JUN-19 to 17-JUN-19

Perambalur Municipality- Project Management Consultant-Biomining of legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 15-JUN-19 to 15-JUN-19

Velur Town Panchayat- SWM-Biomining of Legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 29-MAY-19 to 29-MAY-19

Naravarikkuppam Town Panchayat- SWM-Biomining of Legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 29-MAY-19 to 29-MAY-19

Idappadi Municipality- Project Management Consultant-Biomining of legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 23-MAY-19 to 23-MAY-19

Solid Waste Management System Biomining of Legacy waste of Compost yard by Vikramasingapuram Municipality

Coordinator : Dr. G. Dhinagaran

Duration : 25-APR-19 to 28-JUN-19

Thiruchengode Municipality- Project Management Consultant-Biomining of legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 30-MAR-19 to 30-MAR-19

Compressive Strength for concrete Cube Test -AIEMA Golden Jubliee Tower

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 5900 Lakhs

Duration : 26-MAR-19 to 28-MAR-19

Funding  : AIEMA

Kulithalai Municipality- Project Management Consultant-Biomining of legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 22-MAR-19 to 22-MAR-19

Design Mix M-30- HIG Flats at SAF Games Village Scheme-TNHB

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 41300 Lakhs

Duration : 15-MAR-19 to 15-MAR-19

Funding  : Tamilnadu Housing Board

Solid Waste Management System – Biomining of Legacy waste of Compost yard by Ambasamudram Municipality” - DPR Evaluation

Coordinator : Dr. G. Dhinagaran

Duration : 15-MAR-19 to 14-APR-19

Study on hydrological feasibility of TNHB Avaniapuram Scheme II, Madurai

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 4 Lakhs

Duration : 01-MAR-19 to 25-DEC-19

Funding  : TNHB

Thuraiyur Municipality- SWM-Biomining of Legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 08-FEB-19 to 08-FEB-19

Scoping study for project WASCA in the state of Tamil nadu- Rapid assessment of potential and scope of water security and climate adaptation in Tamil Nadu

Coordinator : Dr. K. Palanivelu

Project Cost : ₹ 7.5 Lakhs

Duration : 18-JAN-19 to 04-JUN-20

Funding  : GIZ,New Delhi

Adequacy Study of APC Measures Boilers in Plant –II, MPL Chennai

Coordinator : Dr. S. Karthikeyan

Duration : 12-JAN-19 to 12-JAN-19

Monitoring and evaluation of Tamil Nadu Irrigated Agriculture Modernization

Coordinator : Dr. Carolin Arul

Project Cost : ₹ 500000 Lakhs

Duration : 10-JAN-19 to 16-MAY-25

Funding  : World Bank

Adequacy Study of APC of Boilers in Plant –I, MPL Chennai

Coordinator : Dr. S. Karthikeyan

Duration : 02-JAN-19 to 02-JAN-19

Perambalur Municipality- SWM-Biomining of Legacy Waste

Coordinator : Dr. S. Karthikeyan

Duration : 28-DEC-18 to 28-DEC-18

Adequacy of Air Pollution Control Measures on Expanded Production Capacity

Coordinator : Dr. S. Karthikeyan

Duration : 26-DEC-18 to 26-DEC-18

Concrete Cube Test

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 5900 Lakhs

Duration : 26-DEC-18 to 02-JAN-19

Funding  : Chitlapakkam Town Panchayat

Concrete Cube Test

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 5900 Lakhs

Duration : 17-DEC-18 to 18-DEC-18

Funding  : Southern Railway

Concrete Cube Test

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 5900 Lakhs

Duration : 17-DEC-18 to 18-DEC-18

Funding  : Greater Chennai Corporation

concrete cube Test

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 5900 Lakhs

Duration : 17-DEC-18 to 18-DEC-18

Funding  : Southern Railway

Quality analysis of Sprinkler irrigation pipes

Coordinator : Dr. V. Ramji

Duration : 16-OCT-18 to 15-NOV-18

Design Mix -M30

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 41300 Lakhs

Duration : 19-SEP-18 to 24-OCT-18

Funding  : Tamilnadu slum clearence board

Emission and Air Quality Analysis

Coordinator : Dr. S. Karthikeyan

Duration : 05-SEP-18 to 05-SEP-18

concrete cube test

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 5900 Lakhs

Duration : 09-JUL-18 to 16-AUG-18

Funding  : Southern Railway

Dynamic Simulation (DS) Modelling of Road Network Design based on geography and Geo-morphological Aspects of Evolving Sustainable Smart City

Coordinator : Dr. G. Umadevi

Duration : 02-JUL-18 to 31-DEC-18

Micro Level Dynmaic Simulation (DS) Modelling of Traffic Impact Assessment for Chennai

Coordinator : Dr. G. Umadevi

Duration : 02-JUL-18 to 31-DEC-18

Project Management Consultant for Dumpsite Biomining Projects

Coordinator : Dr. Kurian Joseph

Duration : 01-JUN-18 to 31-DEC-21

Pollution Load Assessment Study

Coordinator : Dr. S. Karthikeyan

Duration : 17-MAR-18 to 17-MAR-18

TNHB

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 4 Lakhs

Duration : 15-FEB-18 to 27-DEC-18

Funding  : TNHB

Flood Mitigation Strategies for Araniyar Basin

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 80 Lakhs

Duration : 02-FEB-18 to 20-DEC-18

Funding  : WRO, PWD

Emission and Air pollution Studies

Coordinator : Dr. S. Karthikeyan

Duration : 29-JAN-18 to 29-JAN-18

Biomining Project Report Evaluation

Coordinator : Dr. Kurian Joseph

Duration : 02-OCT-17 to 31-OCT-19

Feasibility study to assess the demand for parking of vehicles at Industrial Estate Guindy

Coordinator : Dr. K. Gunasekaran

Duration : 27-JUN-17 to 01-DEC-17

Preparation of Detailed Project Report for Development of Kathipara Multimodal Urban Square

Coordinator : Dr. K. Gunasekaran

Duration : 19-APR-17 to 01-DEC-17

Design Mix for M25

Coordinator : Dr. G. Beulah Gnana Ananthi

Project Cost : ₹ 3.4 Lakhs

Duration : 01-JAN-17 to 07-JUL-17

Funding  : PWD Chennai CMWSSB

Evaluation of Traffic Flow to Chennai International terminals Pvt Ltd (CITPL) Container Terminal

Coordinator : Dr. K. Gunasekaran

Duration : 04-JUL-16 to 01-DEC-17

Traffic Impact study for Chennai One IT Park - Phase II building

Coordinator : Dr. K. Gunasekaran

Duration : 12-APR-16 to 30-DEC-16

Hydrologic &Hydraulic Design for the Water/Sewer Lines and Storm Water Drainage/RWH

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 4 Lakhs

Duration : 01-JAN-16 to 24-MAY-16

Funding  : CLRI

Analysis of pulverisation levels of soil prepared by the implements through in-situ sieve analysis

Coordinator : Dr. V. Ramji

Duration : 24-JUL-15 to 10-AUG-15

Traffic studies and projection for Andaman and Nicobar islands

Coordinator : Dr. K. Gunasekaran

Duration : 22-JUN-15 to 01-DEC-17

Flood Hazard, Vulnerability and Risk Assessment in Cuddalore District”, Anna Institute of Management

Coordinator : Dr. M. Krishnaveni

Project Cost : ₹ 2.1 Lakhs

Duration : 01-MAY-15 to 16-DEC-15

Funding  : Anna Institute of Management

Inter laboratory comparison studies on Infiltration tests using Double Ring Infiltrometer

Coordinator : Dr. V. Ramji

Duration : 13-JAN-15 to 26-JAN-15

Discharge and Cross sectional profile measurement using Qliner

Coordinator : Dr. E. Arun Babu

Duration : 05-JAN-15 to 30-JAN-15

Mix designs for various Government organizations like CHENNAI PORT TRUST, GREATER CHENNAI CORPORATION, Tamil Nadu slum clearance board, Storm water drain department etc., and private firms like Aqua Designs, MS SHELLTER SOLUTIONS, ICF CHENNAI CPWD, CHENNAI

Coordinator : Dr. V. Ponmalar

Project Cost : ₹ 1696700 Lakhs

Duration : 05-JAN-15 to 31-DEC-24

Funding  : Goverment

Emission Analysis-and Ambient Air Quality Analysis in M/s GRP Limited, SIPCOT, Perunthurai

Coordinator : Dr. S. Karthikeyan

Duration : 02-JAN-15 to 01-APR-15

Study on Passenger Travel Characteristics and Identification of Measures for Improvement of Patronage of TNSTC(Villupuram) Buses

Coordinator : Dr. K. Gunasekaran

Duration : 23-SEP-14 to 18-SEP-15

Experimental investigation on water sprayers in the piping network

Coordinator : Dr. E. Arun Babu

Duration : 01-APR-14 to 30-JUN-14

Long Term Flood Mitigation Measures for Trivandrum City

Coordinator : Dr. V. Lenin Kalyana Sundaram

Duration : 01-AUG-13 to 28-FEB-14

Study on Accidents and role of drivers in SETC Bus accidents

Coordinator : Dr. K. Gunasekaran

Duration : 01-MAY-13 to 01-DEC-17

Design of Intersection at Entry to Rajparis property at Pallavaram

Coordinator : Dr. K. Gunasekaran

Duration : 01-APR-13 to 15-APR-13

Study on Commuters Travel Characteristics along Chennai Metro Rail Corridors

Coordinator : Dr. K. Gunasekaran

Duration : 11-MAR-13 to 10-JUN-13

Methodology to Devise Traffic management Measure during the construction of Metrorail station in the Airport premises

Coordinator : Dr. K. Gunasekaran

Duration : 10-JAN-13 to 08-MAR-13

Emission Analysis and Improvement Measures in M/s K.T.V. Health Food Private Limited, Chennai

Coordinator : Dr. S. Karthikeyan

Duration : 17-DEC-12 to 03-FEB-14

Traffic study for Metro Rail Section ECV 07 (OTA to Airport)

Coordinator : Dr. K. Gunasekaran

Duration : 02-JAN-12 to 30-SEP-13

Parking Study for sathangadu Iron and Steel Market

Coordinator : Dr. K. Gunasekaran

Duration : 02-JAN-12 to 02-JAN-12

Network Analysis for feasibility study in providing Fire Water System to NSSDF

Coordinator : Dr. S. Karthikeyan

Duration : 01-JUL-11 to 01-JUL-12

Planning of Grade Separators along Anna Salai

Coordinator : Dr. K. Gunasekaran

Duration : 01-FEB-11 to 01-FEB-11

Operation of mini Buses in Chennai City and Suburban Areas

Coordinator : Dr. K. Gunasekaran

Duration : 10-JAN-11 to 10-JAN-11

Technical Evaluation of Adequacy of Process Design for Expansion of Effluent Treatment Plant Capacity at Salem Dairy

Coordinator : Dr. S. Karthikeyan

Duration : 27-OCT-10 to 28-NOV-11

Study on Traffic Impact due to the Proposed Assembly and Secretariat Complex to Government Estate

Coordinator : Dr. K. Gunasekaran

Duration : 10-AUG-09 to 10-AUG-09

Development Plan for Least Urbanised Taluks

Coordinator : Dr. K. Gunasekaran

Duration : 14-JUL-09 to 14-JUL-09

Traffic Study for Development of Road Infrastructure and De-congestion Planning for All the Gates in Tuticorin Port

Coordinator : Dr. K. Gunasekaran

Duration : 01-JUL-09 to 01-JUL-09

Study on Traffic Impact due to Proposed state Modern Library at Kotturpuram

Coordinator : Dr. K. Gunasekaran

Duration : 01-JUL-09 to 01-JUL-09

Traffic Impact and Ciruculation Studeis with Simulation Modelling for Inner Ring Road, Chennai.

Coordinator : Dr. G. Umadevi

Duration : 08-JUN-09 to 26-FEB-10

Traffic Impact study for Hilton hotel in IRR Chennai

Coordinator : Dr. G. Umadevi

Duration : 02-FEB-09 to 09-JUN-09

Customer Satisfaction of Vehicle Tracking Control System

Coordinator : Dr. K. Gunasekaran

Duration : 02-JUN-08 to 02-JUN-08

Traffic operational Management for Medium Town Thirupatthur

Coordinator : Dr. G. Umadevi

Duration : 01-DEC-03 to 31-AUG-04

Traffic operational Management for Medium Town pattukottai

Coordinator : Dr. G. Umadevi

Duration : 30-NOV-01 to 31-DEC-02