Consultancy
Mix Design of Concrete
Coordinator : Dr. S. Rahima Shabeen
Project Cost : ₹ .413 Lakhs
Duration : 22-APR-25 to 21-MAY-25
Funding : KSR Associates
Techno-Socio Impact Study on CNG Pipe Crossings at Ponnai River and Palar River
Coordinator : Dr. E. Arun Babu
Project Cost : ₹ 9.86143 Lakhs
Duration : 20-FEB-25 to 20-MAY-25
Funding : AGP City Gas Pvt Ltd Vellore
Shoreline Change Study at Kattupalli, Ponneri Taluk, Tamil Nadu
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 27 Lakhs
Duration : 09-JAN-25 to 27-DEC-21
Funding : Adani Port
Mix Design of Concrete
Coordinator : Dr. S. Rahima Shabeen
Project Cost : ₹ .413 Lakhs
Duration : 30-DEC-24 to 30-JAN-25
Funding : Blue Leaf Project Pvt Ltd
Mix Design of Concrete
Coordinator : Dr. S. Rahima Shabeen
Project Cost : ₹ .413 Lakhs
Duration : 10-OCT-24 to 11-NOV-24
Funding : Vedass Global Infrastructure & Projects Pvt. Ltd
TANFED-500MTs Capacity Godown constructed in the year 1975- To issue stability certificate for the Foundation and building
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 68500 Lakhs
Duration : 18-JUN-24 to 24-JUN-24
Funding : TAMILNADU COOPERATIVE MARKETING FEDERATION LIMITED
Mix Design of Concrete
Coordinator : Dr. S. Rahima Shabeen
Project Cost : ₹ .413 Lakhs
Duration : 14-JUN-24 to 15-JUL-24
Funding : Sri Vari Constructions
Inspecting the building situated at old No.37, New No.06, Arcot Road, Vadapalani chennai-600026 and submission of report on stability of the building
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 157000 Lakhs
Duration : 09-JUN-24 to 21-JUN-24
Funding : Deputy Revenue officer/Zonal officer
vetting of the structural design and detailing of the proposed upgradation of vyasarpadi kannigapuram playground construction, Chennai
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 83048 Lakhs
Duration : 16-MAY-24 to 20-MAY-24
Funding : Chennai Metropolitan Development Authority chennai
Mix Design of Concrete
Coordinator : Dr. S. Rahima Shabeen
Project Cost : ₹ .413 Lakhs
Duration : 03-MAY-24 to 03-JUN-24
Funding : GRM Construction
Removal of legacy waste dumped at resource recovery park in kaveripakkam town panchayat through biomining
Coordinator : B. Manimekalai
Project Cost : ₹ 236000 Lakhs
Duration : 27-APR-24 to 10-DEC-24
Funding : Kaveripakkam
TANFED-500MTs Capacity Godown constructed in the year 1975-To issue stability certificate for Foundation and building
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 20000 Lakhs
Duration : 22-APR-24 to 10-MAY-24
Funding : Tamilnadu Cooperative Marketing Federation Limited
vetting of the structural design and detailing of the upgradation of May day park at chintadripet, Chennai
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 28426 Lakhs
Duration : 06-APR-24 to 12-APR-24
Funding : Chennai Metropolitan Development Authority, Chennai
vetting of the structural design and detailing of the redevelopment of Dobikhana at chetpet, chennai
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 363747 Lakhs
Duration : 06-APR-24 to 12-APR-24
Funding : Chennai Metropolitan Development Authority, Chennai
Preliminary Visual Inspection of Building
Coordinator : Dr. S. Rahima Shabeen
Project Cost : ₹ .2 Lakhs
Duration : 15-MAR-24 to 15-APR-24
Funding : Individual
Inspection on Construction of Medical College Building
Coordinator : Dr. S. Rahima Shabeen
Project Cost : ₹ 2.5 Lakhs
Duration : 12-MAR-24 to 12-APR-24
Funding : PWD
vetting of the Structural design and detailing of the proposed construction of the community hall, new Street at Alandur, Chennai
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 126089 Lakhs
Duration : 11-MAR-24 to 18-MAR-24
Funding : Chennai Metropoloitan Development authority , Chennai
M30 Mix Design for providing Comprehensive underground sewerage scheme to jalladampettai division 191, Zone XIV in the expand chennai city
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 41300 Lakhs
Duration : 11-MAR-24 to 08-APR-24
Funding : NR and Co
Inspecting the building situated at old no.37, new no.06, Arcot road, Vadapalani, Chennai-600026 and submission of report on stability of the building
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 20000 Lakhs
Duration : 11-MAR-24 to 12-APR-24
Funding : Deputy Revenue officer/Zonal officer
Design and Vetting for 25 MT incinerator of vellore corporation
Coordinator : B. Manimekalai
Project Cost : ₹ 295000 Lakhs
Duration : 11-MAR-24 to 10-DEC-24
Funding : vellore corporation
Mix Design of Concrete
Coordinator : Dr. S. Rahima Shabeen
Project Cost : ₹ .944 Lakhs
Duration : 20-JAN-24 to 20-FEB-24
Funding : N.S.Periasamy & Co.
Vetting of the structural Design and detailing of the proposed construction of New school Complex in Corporation Middle School at Mahalakshmi Nagar, Puzhal
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 127801 Lakhs
Duration : 02-DEC-23 to 15-DEC-23
Funding : Chennai Metroplitan Development Authority
Vetting of the structural Design and detailing of the proposed construction of New Buildings inside the gvt high school campus at konambedu, Annanur
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 88914 Lakhs
Duration : 02-DEC-23 to 15-DEC-23
Funding : Chennai metropolitan development Authority
Preparation of Detailed Project Report for Establishment of Integrated Toll Gate Monitoring Centre
Coordinator : Dr. P. Shoba
Project Cost : ₹ 8.26 Lakhs
Duration : 17-SEP-23 to 25-OCT-24
Funding : Tamil Nadu Police Department
Mix Design of Concrete
Coordinator : Dr. S. Rahima Shabeen
Project Cost : ₹ .413 Lakhs
Duration : 17-AUG-23 to 18-SEP-23
Funding : Shanmathi Constructions (P) Ltd
Removal of legacy waste dumped at sholavandan Town Panchayat on resource recovery park at Ward No.3,Andyamedu main Road through biominig
Coordinator : B. Manimekalai
Project Cost : ₹ 236000 Lakhs
Duration : 16-JUN-23 to 10-DEC-24
Funding : Sholavandan Town Panchayat,Madurai,Tamilnadu
MIX DESIGN for M20, M25, M30
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 295000 Lakhs
Duration : 27-MAY-23 to 27-JUN-23
Funding : P.S.T Engineering Construction
Chettinad Cement Corporation Pvt.Ltd- Study of impact on Marudhayar River due to the reduction of Safety distance for mining of Periyathirukkonam village, Ariyalur District, Tamilnadu
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 15 Lakhs
Duration : 25-MAY-23 to 01-MAY-21
Funding : Chettinad Cement Corporation Pvt.Ltd
Removal of legacy waste dumped at resource recovery park in Neerathan Rangasamuthiram road,Ward No.17 at Vadipatti Town Panchayat through Biomining
Coordinator : B. Manimekalai
Project Cost : ₹ 236000 Lakhs
Duration : 03-MAY-23 to 10-DEC-24
Funding : Vadipatti Town Panchayat
Removal of legacy waste dumped at ward No.11,Palamedu main road,Alaganallur Town Pachayat on resource recovery park through biomining
Coordinator : B. Manimekalai
Project Cost : ₹ 236000 Lakhs
Duration : 27-APR-23 to 10-DEC-24
Funding : Alanganallur Town Panchayat,Madurai,Tamilnadu
Biomining of legay waste dumped at the samykulam old compost yard in chinnamanur Municipality-DPR Evaluation
Coordinator : B. Manimekalai
Project Cost : ₹ 177000 Lakhs
Duration : 14-FEB-23 to 26-DEC-23
Funding : Chinnamanur Municipality
Biomining of legacy waste of Neikarapatti town panchayat
Coordinator : B. Manimekalai
Project Cost : ₹ 236000 Lakhs
Duration : 14-FEB-23 to 10-DEC-24
Funding : Neikkarapatti Town Panchayat
Solid waste Management systems-Biomiining of legacy waste of keeranur town Panchayat
Coordinator : B. Manimekalai
Project Cost : ₹ 236000 Lakhs
Duration : 10-FEB-23 to 10-DEC-24
Funding : Keeranur Town Panchayat,Dindugal,Tamilnadu
Removal of Legacy waste through Biomining process in Vedahndur Town Panchayat
Coordinator : B. Manimekalai
Project Cost : ₹ 236000 Lakhs
Duration : 02-FEB-23 to 02-FEB-24
Funding : Vedachandhur Town panchayat, Government of Tamilnadu
Removal of legacy waste through biomining process in Nilakottai Town Panchayat
Coordinator : B. Manimekalai
Project Cost : ₹ 236000 Lakhs
Duration : 02-FEB-23 to 10-DEC-24
Funding : Nilakottai Town Panchayat
Biomining of legacy waste of chinnamanur Municipality
Coordinator : B. Manimekalai
Project Cost : ₹ 413000 Lakhs
Duration : 05-JAN-23 to 10-DEC-24
Funding : Chinnamanur Municipality,Theni,Tamilnadu
Tail End Regulation Consultancy- Preparation of concept note for the construction of Tail end negotiation to prevent the intrusion of sea water under Climate Fund" funded by Tail End Regulation Consultancy, Vellore
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 6 Lakhs
Duration : 04-JAN-23 to 25-SEP-25
Funding : Tail End Regulation Consultancy
Biomining project for removing legacy waste at Kannamangalam Town Panchayat
Coordinator : B. Manimekalai
Project Cost : ₹ 236000 Lakhs
Duration : 30-DEC-22 to 10-DEC-24
Funding : Kannamangalam Town Panchayat
Solid waste Management System-Bioming of legacy waste of Natham Town panchayat
Coordinator : B. Manimekalai
Project Cost : ₹ 236000 Lakhs
Duration : 26-AUG-22 to 10-DEC-24
Funding : NATHAM Town Pachyat,Tamilnadu
Biomining of legacy waste of Aundipatty selection grade Town Panchayat
Coordinator : B. Manimekalai
Project Cost : ₹ 236000 Lakhs
Duration : 26-AUG-22 to 10-DEC-24
Funding : Aundipatti Sl.Gr.Town Panchayat,Tamilnadu
Biomining of legacy waste of Palanichettipatti Town Panchayat
Coordinator : B. Manimekalai
Project Cost : ₹ 236000 Lakhs
Duration : 26-AUG-22 to 10-DEC-24
Funding : Palanichetti patti Town Panchayat
Identification of Sand Accretion sites in Non-Sensitive site at Andaman & Nicobar islands
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 8.5 Lakhs
Duration : 08-APR-22 to 09-MAY-23
Funding : XX
Cuddalore PWD Project – The Comprehensive flood protection plan to three reivers in Cuddalore District" funded by PWD Cuddalore Consultancy
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 9.44 Lakhs
Duration : 02-FEB-21 to 29-NOV-22
Funding : PWD Cuddalore Consultancy
Design of pipe network& pumping station for the diversion of flood water from Tamirabarani river to Vaippar river
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 9.44 Lakhs
Duration : 01-FEB-21 to 30-NOV-22
Funding : XX
Traffic Impact study of e-challan by traffic police in greater Chennai police
Coordinator : Dr. G. Umadevi
Duration : 21-DEC-20 to 26-FEB-21
Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 56294 m3) through biomining†in Dharm
Coordinator : Dr. G. Dhinagaran
Duration : 19-SEP-20 to 18-JUN-21
Solid Waste Management System – Biomining of Legacy waste of Madathukulam Town Panchayat – PMC
Coordinator : Dr. G. Dhinagaran
Duration : 22-AUG-20 to 21-FEB-21
"Solid Waste Management system - Biomining of Legacy waste dumped at Private Lan - NGT case No.21/2019"
Coordinator : Dr. G. Dhinagaran
Duration : 24-MAR-20 to 23-SEP-20
"Solid waste Management - Removal of the Legacy waste dumped (approximately 32454 m3) through biomining in Mettupalayam Municipality
Coordinator : Dr. G. Dhinagaran
Duration : 24-MAR-20 to 23-DEC-20
"Solid waste Management - Removal of the Legacy waste dumped (approximately 95700 m3) through biomining in Pollachi Municipality
Coordinator : Dr. G. Dhinagaran
Duration : 21-MAR-20 to 20-MAR-21
Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 30050 m3) through biomining†in Kaday
Coordinator : Dr. G. Dhinagaran
Duration : 17-MAR-20 to 16-SEP-20
Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 20500 m3) through biomining†in Ambas
Coordinator : Dr. G. Dhinagaran
Duration : 17-MAR-20 to 16-SEP-20
Aranthangi Municipality- Project Management Consultant-Biomining of legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 10-MAR-20 to 10-MAR-20
Design of Storm Water Drain for TPIPL Project
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 3 Lakhs
Duration : 04-MAR-20 to 30-NOV-21
Funding : Lancewood Infra Private Limited
MIX DESIGN M30
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 41300 Lakhs
Duration : 20-JAN-20 to 14-FEB-20
Funding : CMWSSB
Evaluation of the DPR of Removal of Legacy Waste dumped on the Compost Yard by Sathyamangalam Municipality
Coordinator : Dr. G. Dhinagaran
Duration : 20-JAN-20 to 20-FEB-20
TNWRD – DRIPII-SPMU-DRIP I spillover Activity to DRIP II –Preparation of Emergency Action Plan for Sothuparai&Servalar Dam by Anna University
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 72 Lakhs
Duration : 01-JAN-20 to 31-DEC-24
Funding : TNWRD
’Monitoring and Evaluation of Tamilnadu Irrigated Agriculture Modernisation (TNIAM) Project
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 900 Lakhs
Duration : 01-JAN-20 to 31-DEC-25
Funding : TNIAM
Pattukkottai Municipality- Project Management Consultant-Biomining of legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 13-DEC-19 to 13-DEC-19
Mix Design - M30
Coordinator : Dr. S. Greeshma
Project Cost : ₹ .41 Lakhs
Duration : 12-DEC-19 to 12-JAN-20
Funding : CPWD
Thiruvarur Municipality- Project Management Consultant-Biomining of legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 28-NOV-19 to 28-NOV-19
“Solid Waste Management System – Biomining of Legacy waste of Sulur Town Panchayat – PMCâ€Â
Coordinator : Dr. G. Dhinagaran
Duration : 20-NOV-19 to 20-MAY-20
Solid Waste Management System – Biomining of Legacy waste of Karaimadai Town Panchayat – Removal of legacy waste dumped on own land through biomin
Coordinator : Dr. G. Dhinagaran
Duration : 20-NOV-19 to 20-MAY-20
Attur Municipality- Project Management Consultant-Biomining of legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 19-NOV-19 to 19-NOV-19
CES– Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 49823 m3) through biomining†i
Coordinator : Dr. G. Dhinagaran
Duration : 16-OCT-19 to 05-JUL-20
CES– Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 25000 m3) through biomining†i
Coordinator : Dr. G. Dhinagaran
Duration : 16-OCT-19 to 15-APR-20
Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 22018 m3) through biomining†in Kange
Coordinator : Dr. G. Dhinagaran
Duration : 25-SEP-19 to 24-MAR-20
Project Management Consultant - “Solid Waste Management - Removing of the Legacy waste dumped (approximately 33700 m3) Through bio mining in Udumalp
Coordinator : Dr. G. Dhinagaran
Duration : 25-SEP-19 to 24-MAR-20
Consultancy work on – “Solid Waste Management System – Biomining of Legacy waste of Anthiyur Town Panchayat – PMCâ€Â
Coordinator : Dr. G. Dhinagaran
Duration : 25-SEP-19 to 24-MAR-20
Consultancy work on – “Solid Waste Management System – Biomining of Legacy waste of Periyanaickenpalayam Town Panchayat – PMCâ€Â
Coordinator : Dr. G. Dhinagaran
Duration : 19-SEP-19 to 18-MAR-20
Solid Waste Management System – Biomining of Legacy waste of Anaimalai Town Panchayat – PMC
Coordinator : Dr. G. Dhinagaran
Duration : 13-SEP-19 to 12-OCT-19
CES– Consultancy work on – “Solid Waste Management System – Biomining of Legacy waste of Avinashi Selection Grade Town Panchayat – PMCâ€Â
Coordinator : Dr. G. Dhinagaran
Duration : 05-SEP-19 to 04-MAR-20
CES– Project Management Consultancy– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 90000 cu.m) through bio-miningï
Coordinator : Dr. G. Dhinagaran
Duration : 04-SEP-19 to 03-SEP-20
Consultancy work on – “Solid Waste Management System – Biomining of Legacy waste of Kunnathur Town Panchayat – PMCâ€Â
Coordinator : Dr. G. Dhinagaran
Duration : 04-SEP-19 to 03-MAR-20
Solid Waste Management System – Biomining of Legacy waste of Suleeswaranpatti Town Panchayat – PMC
Coordinator : Dr. G. Dhinagaran
Duration : 29-AUG-19 to 28-NOV-19
Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 1,41,731 m3) through biomining†in Ka
Coordinator : Dr. G. Dhinagaran
Duration : 22-AUG-19 to 21-FEB-21
Solid Waste Management System – Biomining of Legacy waste of Harur Selection Grade Town Panchayat
Coordinator : Dr. G. Dhinagaran
Duration : 13-AUG-19 to 12-SEP-19
Solid Waste Management System – Biomining of Legacy waste of Karaimadai Town Panchayat – Removal of legacy waste dumped on own land through biomin
Coordinator : Dr. G. Dhinagaran
Duration : 13-AUG-19 to 12-SEP-19
Adequacy Study on Odour Control Measures at M/s Kierratys Fuels
Coordinator : Dr. S. Karthikeyan
Duration : 13-AUG-19 to 13-AUG-19
Project Management Consultant– “Solid Waste Management - Removal of the Legacy Waste dumped (approximately 61577 m3) through biomining†in Krish
Coordinator : Dr. G. Dhinagaran
Duration : 08-AUG-19 to 07-MAY-20
Solid Waste Management System – Biomining of Legacy waste of Annur Town Panchayat – Removal of legacy waste dumped on own land through biomining i
Coordinator : Dr. G. Dhinagaran
Duration : 07-AUG-19 to 06-SEP-19
Solid Waste Management System – Biomining of Legacy waste of Pallapatti Selection Grade Town Panchayat – DPR Evaluation
Coordinator : Dr. G. Dhinagaran
Duration : 02-AUG-19 to 01-SEP-19
Omalur Town Panchayat- SWM-Biomining of Legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 26-JUL-19 to 26-JUL-19
Consultancy work on “Project Management Consultant for Bio-Mining Project for for removing legacy waste dumped on Private land†by Vellakovil Muni
Coordinator : Dr. G. Dhinagaran
Duration : 17-JUL-19 to 16-JUL-20
Consultancy work on – “Solid Waste Management System – Biomining of Legacy waste of Denkanikottai Selection Grade Town Panchayat – DPR Evaluat
Coordinator : Dr. G. Dhinagaran
Duration : 15-JUL-19 to 14-AUG-19
Consultancy work on – Revamping of Existing Dumped Legacy waste (approximately 32454 cum) in Municipal compost yard at Sirjaj nagar, Chickkadasamapa
Coordinator : Dr. G. Dhinagaran
Duration : 15-JUL-19 to 14-AUG-19
Rasipuram Municipality- Project Management Consultant-Biomining of legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 01-JUL-19 to 01-JUL-19
Consultancy work on – “Solid Waste Management System – Biomining of Legacy waste of Kaveripattinam Selection Grade Town Panchayat – DPR Evalua
Coordinator : Dr. G. Dhinagaran
Duration : 28-JUN-19 to 28-JUN-19
Pallipalayam Municipality-SWM-- Project Management Consultant-Biomining of legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 19-JUN-19 to 19-JUN-19
Solid Waste Management System – Biomining of Legacy waste of Dharapuram Municipality – DPR Evaluation
Coordinator : Dr. G. Dhinagaran
Duration : 18-JUN-19 to 18-JUL-19
Jalakandapuram Town Panchayat- SWM-Biomining of Legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 17-JUN-19 to 17-JUN-19
Perambalur Municipality- Project Management Consultant-Biomining of legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 15-JUN-19 to 15-JUN-19
Velur Town Panchayat- SWM-Biomining of Legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 29-MAY-19 to 29-MAY-19
Naravarikkuppam Town Panchayat- SWM-Biomining of Legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 29-MAY-19 to 29-MAY-19
Idappadi Municipality- Project Management Consultant-Biomining of legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 23-MAY-19 to 23-MAY-19
Solid Waste Management System Biomining of Legacy waste of Compost yard by Vikramasingapuram Municipality
Coordinator : Dr. G. Dhinagaran
Duration : 25-APR-19 to 28-JUN-19
Thiruchengode Municipality- Project Management Consultant-Biomining of legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 30-MAR-19 to 30-MAR-19
Compressive Strength for concrete Cube Test -AIEMA Golden Jubliee Tower
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 5900 Lakhs
Duration : 26-MAR-19 to 28-MAR-19
Funding : AIEMA
Kulithalai Municipality- Project Management Consultant-Biomining of legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 22-MAR-19 to 22-MAR-19
Design Mix M-30- HIG Flats at SAF Games Village Scheme-TNHB
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 41300 Lakhs
Duration : 15-MAR-19 to 15-MAR-19
Funding : Tamilnadu Housing Board
Solid Waste Management System – Biomining of Legacy waste of Compost yard by Ambasamudram Municipality†- DPR Evaluation
Coordinator : Dr. G. Dhinagaran
Duration : 15-MAR-19 to 14-APR-19
Study on hydrological feasibility of TNHB Avaniapuram Scheme II, Madurai
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 4 Lakhs
Duration : 01-MAR-19 to 25-DEC-19
Funding : TNHB
Thuraiyur Municipality- SWM-Biomining of Legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 08-FEB-19 to 08-FEB-19
Scoping study for project WASCA in the state of Tamil nadu- Rapid assessment of potential and scope of water security and climate adaptation in Tamil Nadu
Coordinator : Dr. K. Palanivelu
Project Cost : ₹ 7.5 Lakhs
Duration : 18-JAN-19 to 04-JUN-20
Funding : GIZ,New Delhi
Adequacy Study of APC Measures Boilers in Plant –II, MPL Chennai
Coordinator : Dr. S. Karthikeyan
Duration : 12-JAN-19 to 12-JAN-19
Monitoring and evaluation of Tamil Nadu Irrigated Agriculture Modernization
Coordinator : Dr. Carolin Arul
Project Cost : ₹ 500000 Lakhs
Duration : 10-JAN-19 to 16-MAY-25
Funding : World Bank
Adequacy Study of APC of Boilers in Plant –I, MPL Chennai
Coordinator : Dr. S. Karthikeyan
Duration : 02-JAN-19 to 02-JAN-19
Perambalur Municipality- SWM-Biomining of Legacy Waste
Coordinator : Dr. S. Karthikeyan
Duration : 28-DEC-18 to 28-DEC-18
Adequacy of Air Pollution Control Measures on Expanded Production Capacity
Coordinator : Dr. S. Karthikeyan
Duration : 26-DEC-18 to 26-DEC-18
Concrete Cube Test
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 5900 Lakhs
Duration : 26-DEC-18 to 02-JAN-19
Funding : Chitlapakkam Town Panchayat
Concrete Cube Test
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 5900 Lakhs
Duration : 17-DEC-18 to 18-DEC-18
Funding : Southern Railway
Concrete Cube Test
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 5900 Lakhs
Duration : 17-DEC-18 to 18-DEC-18
Funding : Greater Chennai Corporation
concrete cube Test
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 5900 Lakhs
Duration : 17-DEC-18 to 18-DEC-18
Funding : Southern Railway
Quality analysis of Sprinkler irrigation pipes
Coordinator : Dr. V. Ramji
Duration : 16-OCT-18 to 15-NOV-18
Design Mix -M30
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 41300 Lakhs
Duration : 19-SEP-18 to 24-OCT-18
Funding : Tamilnadu slum clearence board
Emission and Air Quality Analysis
Coordinator : Dr. S. Karthikeyan
Duration : 05-SEP-18 to 05-SEP-18
concrete cube test
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 5900 Lakhs
Duration : 09-JUL-18 to 16-AUG-18
Funding : Southern Railway
Dynamic Simulation (DS) Modelling of Road Network Design based on geography and Geo-morphological Aspects of Evolving Sustainable Smart City
Coordinator : Dr. G. Umadevi
Duration : 02-JUL-18 to 31-DEC-18
Micro Level Dynmaic Simulation (DS) Modelling of Traffic Impact Assessment for Chennai
Coordinator : Dr. G. Umadevi
Duration : 02-JUL-18 to 31-DEC-18
Project Management Consultant for Dumpsite Biomining Projects
Coordinator : Dr. Kurian Joseph
Duration : 01-JUN-18 to 31-DEC-21
Pollution Load Assessment Study
Coordinator : Dr. S. Karthikeyan
Duration : 17-MAR-18 to 17-MAR-18
TNHB
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 4 Lakhs
Duration : 15-FEB-18 to 27-DEC-18
Funding : TNHB
Flood Mitigation Strategies for Araniyar Basin
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 80 Lakhs
Duration : 02-FEB-18 to 20-DEC-18
Funding : WRO, PWD
Emission and Air pollution Studies
Coordinator : Dr. S. Karthikeyan
Duration : 29-JAN-18 to 29-JAN-18
Biomining Project Report Evaluation
Coordinator : Dr. Kurian Joseph
Duration : 02-OCT-17 to 31-OCT-19
Feasibility study to assess the demand for parking of vehicles at Industrial Estate Guindy
Coordinator : Dr. K. Gunasekaran
Duration : 27-JUN-17 to 01-DEC-17
Preparation of Detailed Project Report for Development of Kathipara Multimodal Urban Square
Coordinator : Dr. K. Gunasekaran
Duration : 19-APR-17 to 01-DEC-17
Design Mix for M25
Coordinator : Dr. G. Beulah Gnana Ananthi
Project Cost : ₹ 3.4 Lakhs
Duration : 01-JAN-17 to 07-JUL-17
Funding : PWD Chennai CMWSSB
Evaluation of Traffic Flow to Chennai International terminals Pvt Ltd (CITPL) Container Terminal
Coordinator : Dr. K. Gunasekaran
Duration : 04-JUL-16 to 01-DEC-17
Traffic Impact study for Chennai One IT Park - Phase II building
Coordinator : Dr. K. Gunasekaran
Duration : 12-APR-16 to 30-DEC-16
Hydrologic &Hydraulic Design for the Water/Sewer Lines and Storm Water Drainage/RWH
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 4 Lakhs
Duration : 01-JAN-16 to 24-MAY-16
Funding : CLRI
Analysis of pulverisation levels of soil prepared by the implements through in-situ sieve analysis
Coordinator : Dr. V. Ramji
Duration : 24-JUL-15 to 10-AUG-15
Traffic studies and projection for Andaman and Nicobar islands
Coordinator : Dr. K. Gunasekaran
Duration : 22-JUN-15 to 01-DEC-17
Flood Hazard, Vulnerability and Risk Assessment in Cuddalore District”, Anna Institute of Management
Coordinator : Dr. M. Krishnaveni
Project Cost : ₹ 2.1 Lakhs
Duration : 01-MAY-15 to 16-DEC-15
Funding : Anna Institute of Management
Inter laboratory comparison studies on Infiltration tests using Double Ring Infiltrometer
Coordinator : Dr. V. Ramji
Duration : 13-JAN-15 to 26-JAN-15
Discharge and Cross sectional profile measurement using Qliner
Coordinator : Dr. E. Arun Babu
Duration : 05-JAN-15 to 30-JAN-15
Mix designs for various Government organizations like CHENNAI PORT TRUST, GREATER CHENNAI CORPORATION, Tamil Nadu slum clearance board, Storm water drain department etc., and private firms like Aqua Designs, MS SHELLTER SOLUTIONS, ICF CHENNAI CPWD, CHENNAI
Coordinator : Dr. V. Ponmalar
Project Cost : ₹ 1696700 Lakhs
Duration : 05-JAN-15 to 31-DEC-24
Funding : Goverment
Emission Analysis-and Ambient Air Quality Analysis in M/s GRP Limited, SIPCOT, Perunthurai
Coordinator : Dr. S. Karthikeyan
Duration : 02-JAN-15 to 01-APR-15
Study on Passenger Travel Characteristics and Identification of Measures for Improvement of Patronage of TNSTC(Villupuram) Buses
Coordinator : Dr. K. Gunasekaran
Duration : 23-SEP-14 to 18-SEP-15
Experimental investigation on water sprayers in the piping network
Coordinator : Dr. E. Arun Babu
Duration : 01-APR-14 to 30-JUN-14
Long Term Flood Mitigation Measures for Trivandrum City
Coordinator : Dr. V. Lenin Kalyana Sundaram
Duration : 01-AUG-13 to 28-FEB-14
Study on Accidents and role of drivers in SETC Bus accidents
Coordinator : Dr. K. Gunasekaran
Duration : 01-MAY-13 to 01-DEC-17
Design of Intersection at Entry to Rajparis property at Pallavaram
Coordinator : Dr. K. Gunasekaran
Duration : 01-APR-13 to 15-APR-13
Study on Commuters Travel Characteristics along Chennai Metro Rail Corridors
Coordinator : Dr. K. Gunasekaran
Duration : 11-MAR-13 to 10-JUN-13
Methodology to Devise Traffic management Measure during the construction of Metrorail station in the Airport premises
Coordinator : Dr. K. Gunasekaran
Duration : 10-JAN-13 to 08-MAR-13
Emission Analysis and Improvement Measures in M/s K.T.V. Health Food Private Limited, Chennai
Coordinator : Dr. S. Karthikeyan
Duration : 17-DEC-12 to 03-FEB-14
Traffic study for Metro Rail Section ECV 07 (OTA to Airport)
Coordinator : Dr. K. Gunasekaran
Duration : 02-JAN-12 to 30-SEP-13
Parking Study for sathangadu Iron and Steel Market
Coordinator : Dr. K. Gunasekaran
Duration : 02-JAN-12 to 02-JAN-12
Network Analysis for feasibility study in providing Fire Water System to NSSDF
Coordinator : Dr. S. Karthikeyan
Duration : 01-JUL-11 to 01-JUL-12
Planning of Grade Separators along Anna Salai
Coordinator : Dr. K. Gunasekaran
Duration : 01-FEB-11 to 01-FEB-11
Operation of mini Buses in Chennai City and Suburban Areas
Coordinator : Dr. K. Gunasekaran
Duration : 10-JAN-11 to 10-JAN-11
Technical Evaluation of Adequacy of Process Design for Expansion of Effluent Treatment Plant Capacity at Salem Dairy
Coordinator : Dr. S. Karthikeyan
Duration : 27-OCT-10 to 28-NOV-11
Study on Traffic Impact due to the Proposed Assembly and Secretariat Complex to Government Estate
Coordinator : Dr. K. Gunasekaran
Duration : 10-AUG-09 to 10-AUG-09
Development Plan for Least Urbanised Taluks
Coordinator : Dr. K. Gunasekaran
Duration : 14-JUL-09 to 14-JUL-09
Traffic Study for Development of Road Infrastructure and De-congestion Planning for All the Gates in Tuticorin Port
Coordinator : Dr. K. Gunasekaran
Duration : 01-JUL-09 to 01-JUL-09
Study on Traffic Impact due to Proposed state Modern Library at Kotturpuram
Coordinator : Dr. K. Gunasekaran
Duration : 01-JUL-09 to 01-JUL-09
Traffic Impact and Ciruculation Studeis with Simulation Modelling for Inner Ring Road, Chennai.
Coordinator : Dr. G. Umadevi
Duration : 08-JUN-09 to 26-FEB-10
Traffic Impact study for Hilton hotel in IRR Chennai
Coordinator : Dr. G. Umadevi
Duration : 02-FEB-09 to 09-JUN-09
Customer Satisfaction of Vehicle Tracking Control System
Coordinator : Dr. K. Gunasekaran
Duration : 02-JUN-08 to 02-JUN-08
Traffic operational Management for Medium Town Thirupatthur
Coordinator : Dr. G. Umadevi
Duration : 01-DEC-03 to 31-AUG-04
Traffic operational Management for Medium Town pattukottai
Coordinator : Dr. G. Umadevi
Duration : 30-NOV-01 to 31-DEC-02